  1. What Liquidation Means for Your Building Contract
  2. Why the Stage of the Build Matters
  3. What the Queensland Home Warranty Scheme Covers
  4. How Long Do Claims Take?
  5. The Most Common Mistakes When the Builder Stops Work
  6. Example: A Flood of Emails From the Builder
  7. Steps To Take Now
  8. Frequently Asked Questions
  9. Talk to Becker Watt If Your Builder Has Stopped Work

Your builder has gone into liquidation and work on your home has stopped. It is one of the most stressful things that can happen during a build, but for most homeowners there is a clear way forward.

“It’s frustrating for the homeowners, but in most cases it’s a very easy fix,” says Conor Stensness, Associate at Becker Watt Lawyers. “Nine times out of ten, you simply terminate the contract because the builder has gone insolvent, and then the homeowner can get a new builder to come in and take over the job.”

The key is doing it in the right order. This guide explains the steps, what the Queensland Home Warranty Scheme covers, and the mistakes that cause the most trouble.

What Liquidation Means for Your Building Contract

When a building company goes into liquidation or administration, a liquidator or administrator takes control of it. The company usually stops trading, sites are shut down and staff and subcontractors stop work. In Queensland, the QBCC will normally cancel or suspend the company’s licence.

Your contract does not end by itself. Most residential contracts give the owner the right to terminate if the builder becomes insolvent, but the contract sets out how that must be done. That step matters, because a valid termination is what opens the door to a claim under the Queensland Home Warranty Scheme.

Why the Stage of the Build Matters

Conor says the right approach depends on how far the build has got.

  • Before work starts. “If a client has just engaged a builder and they haven’t broken ground or put down the slab, then nothing has actually happened,” he explains. In that case you can usually terminate and engage a new builder. The main question is the deposit you paid.
  • Part way through. “If they’re halfway through, for example at the enclosed or lockup stage, it’s a little bit trickier,” Conor says. “You have to take certain steps under the contract to make sure it is validly terminated before taking it into QBCC territory and making a claim under the home warranty insurance.”

Read also: A beginner’s guide to home warranty insurance in Queensland

What the Queensland Home Warranty Scheme Covers

The Queensland Home Warranty Scheme, run by the QBCC, applies to residential work by a licensed contractor valued at more than $3,300. When a builder cannot finish because of insolvency, the scheme can cover:

  • Non-completion: the reasonable extra cost of having another builder finish the work, over what you would have paid under the original contract, up to the scheme limit (currently $200,000 under standard cover);
  • Deposits and payments for work that was paid for but not done, within the scheme’s rules;
  • Defects in the work already done, within the time limits;
  • Accommodation and storage costs for owner-occupiers in some cases, while the home cannot be lived in.

What it does not cover is just as important:

  • work by an unlicensed builder;
  • deposits above the legal maximum (10% for work under $20,000 and 5% for work of $20,000 or more, with some exceptions);
  • non-completion under cost plus or construction management contracts;
  • contracts that were not validly ended, or claims made outside the time limits.

How Long Do Claims Take?

“At the moment, we’re roughly seeing somewhere between 8 and 12 weeks,” says Conor. “The QBCC is the overarching body for the whole building industry in Queensland, and government takes some time. It could be anywhere between two and three months.”

That time is easier to manage when the claim is complete from the start: the contract, proof of payments, the termination notice and evidence of the state of the work.

The Most Common Mistakes When the Builder Stops Work

“They start to panic,” Conor says. “They start sending various notices to the builder, and those notices are not correctly worded, or they are sent incorrectly. Both can make them invalid.”

An invalid notice is not just wasted effort. “If you as a homeowner are in breach of the contract yourself, it makes things very difficult moving forward,” he warns. That can delay or weaken a home warranty claim.

Other mistakes we see:

  • paying the next progress claim, or more money to the builder, after work has stopped;
  • bringing in a new builder before the old contract has been validly ended and the site documented;
  • not photographing the site and collecting documents before access is lost;
  • missing the QBCC’s time limits for lodging a claim.

Example: A Flood of Emails From the Builder

One current client came to us after works had stopped. The builder had bombarded them with emails and other correspondence, and the owners had started replying to all of it.

“It’s very frustrating at both ends, because you have two parties who don’t actually follow the contract correctly,” Conor says. “It just creates a much larger mess than is necessary.” The fix in a case like this is to stop, work out what the contract requires, and send one correct notice.

Steps To Take Now

  • Stop paying the builder until you have advice.
  • Find your contract, payment records and any notices you have received.
  • Photograph the site and the state of the work.
  • Check the builder’s licence status and any liquidator’s notice.
  • Speak with a construction lawyer before you send any notice.
  • Once the contract is validly ended, lodge your home warranty claim with the QBCC.

Frequently Asked Questions

Can I get my deposit back if my builder goes into liquidation?

Often, yes, through the Queensland Home Warranty Scheme, if the deposit was within the legal limit, the builder was licensed and the contract was properly ended.

Do I need to terminate the contract before claiming?

Yes. For a non-completion claim the contract must be validly ended first. Get advice on how to do this under your contract.

Can the liquidator finish my house?

Rarely. Liquidators usually do not complete residential builds, but they may write to you about the contract. Do not agree to anything before getting advice.

Talk to Becker Watt If Your Builder Has Stopped Work

If your builder has gone into liquidation or simply stopped turning up, the first notice you send matters. Becker Watt Lawyers help homeowners across Brisbane and the Gold Coast end contracts properly and get their build back on track. Find out more about our construction dispute lawyers, or send us a message.

This article is general information, not legal advice for your situation. For advice on your matter, call 07 3269 4888 or send us a message.

Related Articles

If you’ve been given a payment claim and don’t plan to pay it in full, you must give the claimant [...]

A payment claim that misses one requirement can fail. And you may not find out until the other side pushes [...]

When building or renovating a home, one of the biggest decisions is the contract you sign with your builder. Two [...]

Send us a message

Tell us briefly what is happening and a construction lawyer will get back to you to talk it through.

  • 4.9 Google rating
  • $220 initial consultation
  • Confidential
This field is for validation purposes and should be left unchanged.
Name(Required)

Prefer to talk? Call 07 3269 4888